Strong Thermal Stability Polyurea Coatings Impact Resistance Coating

Appearance: Liquid
Main Raw Material: Polyurethane
Method: Spray
Level: Finish Coat
Certification: ISO14001, ISO9001
Components: Film Forming Matter

Products Details

Basic Info.

Model NO.
TH-701
Formation Mechanism
Conversion Type
Substrate
No Limit
Drying Method
Chemical Merchanism Drying
Color
Component a: Transparent/Light Yellow B Customized
EINECS
Polyurea
Formula
R-Nh-Co-CH-R`
CAS No.
Polyurea
Transport Package
Pallet
Specification
Component A: 220KG/bucket Component B: 210KG/bucke
Trademark
0
Origin
China
HS Code
3911900003
Production Capacity
8000t/Year

Product Description

SPUA Hybrid Spray Polyurea Elastomer Coating
Descriptions TH802 is an aromatic polyurea elastomer with a solid content of up to 100%. Due to its excellent waterproof, anti-corrosion and good wear resistance, this product is widely used in the field of industrial and commercial anti-corrosion and waterproof protection.
Features and advantages 1. Two-component, solvent-free, 100% solid content, environmentally friendly material.
2. The curing speed is fast, and it can be sprayed and formed on any curved surface without sagging.
3. The coating is dense, no seams, strong adhesion, and completely isolated from air.
4. Excellent physical properties: high strength, high elongation, high tear strength. 
Application scopes Anti-corrosion and waterproof protection in many fields such as construction, chemical industry, aerospace, transportation, metallurgy, marine ships, electric power, etc. 
Product information Component A: transparent/light yellow
Component  B: Customized
Physical properties  1. Solid content: 100%
2. Gel time (s): ≤45
3. Surface drying time (s): ≤45
4. Tensile strength (MPa): ≥16
5. Elongation at break (%): ≥450
6. Tear strength (N/mm)≥50
7. Low temperature bending property (ºC)≤-40
8. Water impermeability: 0.4MPa, 2H impermeable 
Corrosion performance  Can withstand the erosion of water, sea water, acid, alkali, salt and other media 
 Packing  Component A: 220KG/bucket Component B: 210KG/bucket  One 20' container loads 80 drums/17.2 ton
Construction environment  Ambient temperature ≥5ºC, air humidity ≤85% 
Construction Notes  1. During construction, the temperature of the substrate must be 3°C higher than the dew point temperature.
2. Before the product is used, component B should be fully stirred.
3. The system has a 100% solid content, and it is strictly forbidden to add any diluent.
4. When constructing in a confined space, maintain good ventilation.
5. When using this product, you need to wear work clothes, goggles, gas masks, gloves and other protective equipment. 
Corresponding curing time  5-30 seconds
Shelf life  12 months 
Safety and health information  100% solid content, solvent-free construction safety  and eco-friendly
Caution information for transportation and storage  1. The storage temperature should be 5-30°C.
2. Store in a cool and ventilated environment, avoid direct sunlight, prohibit close to fire sources, and prevent collisions. 
Standard Comply with the national standard GB/T 23446-2009 Type two. 
 Integrity statement  Promise that  product series conform to the national standard GB/T 23446-2009 Type two ; all the listed data are obtained in the relevant laboratory according to the corresponding standard test. The relevant data during the test will be slightly displayed due to the different test environment and methods. difference. With the continuous improvement of products, product performance parameters may change, please keep in touch. 

Spray Polyurea Elastomer Coating SPUA for
Anticorrosion and waterproof protection of construction, chemicals, transportation,
metallurgy,electric power, aerospace, marine, shipbuilding and other fields.

Construction and Project caseStrong Thermal Stability Polyurea Coatings Impact Resistance Coating

SPUA Hybrid Spray Polyurea Elastomer Coating

The versatility of spray polyurea elastomer products 
Product shelf life and storage:
1. The storage temperature should be 5-40ºC
2. Under normal storage and transportation conditions, the storage period is not less than 6 months from the date of production
3. Store in a cool, ventilated environment, avoid direct sunlight, prohibit close to fire sources, and prevent collisions
4. Packaging: component A: 220KG/drum, component B: 210KG/drum
 
Precautions:
1. During construction, the temperature of the substrate must be 3°C higher than the dew point temperature;
2. Before the product is used, component B should be fully stirred;
3. The system has a 100% solid content, and it is strictly forbidden to add any diluent;
4. During construction in a confined space, good ventilation must be maintained;
5. When using this product, you must wear work clothes, goggles, gas masks, gloves and other protective equipment.
 
Product application guidance:
Recommended spraying machine: Gra co H-XP3 polyurea spraying equipment spray gun; air or mechanical self-cleaning polyurea spray gun
Static pressure 2300-2500psi; dynamic pressure 2000-2200psi
Recommended dry film thickness: 1000-3000μm
Recoating interval6h

 
Proportion: Component A: Component B =1:1

SPUA Hybrid Spray Polyurea Elastomer Coating
Packaging  and Shipping
Strong Thermal Stability Polyurea Coatings Impact Resistance Coating

Company Information
Yulin Taylor Machinery Co., Ltd. Located in Yulin city, Guangxi Province, China. We are a manufacturer and exporter, specialized in the research, development and production of spray polyurea coating materials. Our main products: Polyurethane Machine, two Component Spray coating and SprayPolyurea Coating materials etc. 
Strong Thermal Stability Polyurea Coatings Impact Resistance CoatingSPUA Hybrid Spray Polyurea Elastomer Coating
FAQ
1. What is the price for polyurea materials?
The price is decided by Quantity .
 
2. How about samples?
Sample Lead Time: 5 working days
Sample Fee:
1).It's free for all for a regular customer

2).For new customers, we will charge first, it is fully refundable when order confirmed.
 
3. How many days for shipping?
Shipping Methods and Lead Time:
By Express: 3-5 working days to your door (DHL, UPS, TNT, FedEx...)
By Air: 5-8 working days to your airport
By Sea: Pls advise your port of destination, the exact days will be confirmed by our forwarders,  and the following lead time is for your reference. Europe and America (25 - 35 days), Asia (3-7 days), Australia ( 16-23 days)
 

4. What is the Terms of Payment?
Credit Card,T/T, L/C, Western Union;  30% T/T in advance, 70% before delivery.

5. Packaging & Shipping ?
Pallet, wooden case or with outer carton, or as customers' specific requirements.


6. Why choose your company?
We are focusing on all aspects of anticorrosive waterproof, insulation fields. US technology and made in China, high quality and nice prices.
We strictly implement the rules according to the quality standard in every aspects from the purchase of raw material to the production process  and outgoing of products.

Great service and Superior quality is provided all the time…
Packaging & Shipping Packing: Carton, wooden box and pallet, or as customers' requirements.
Shipping: By Express (DHL /UPS /TNT /FedEx /EMS), By Air, By Sea

 

SPUA Hybrid Spray Polyurea Elastomer Coating

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours